Topic outline
-
UNIT TITLE: PERFORM INTERNAL EMERGENCY SERVICE WIRING
UNIT CODE: CONElM3016A2
UNIT DESCRIPTOR: This unit covers the knowledge, skills and attitudes required to perform internal emergency service wiring. It includes preparing for works, installing change over switch, CC TV and camera line, generator line connection, solar home system, Instant Power Supply (IPS) line and maintaining workplace, tools, equipment and materials.
NOMINAL HOURS: 50 Hours
LEARNING OUTCOME: At the end of this session, learners will be able to-
- Prepare for works.
- Install CC TV and camera line.
- Install generator line connection.
- Install solar home system.
- Install Instant Power Supply(IPS) line.
- Maintain workplace, tools, equipment and materials.
FACILITATOR NAME: Md. Jahangir Alam Tarafder ( Shamol )
TEACHER NAME: Samir Kumar Das
Coordinator, ILO Skills 21 Project.
Khulna Mohila Polytechnic Institute.
-
If you have any query, please write.
-
The Structure of the course :
Only Online Course
Or
Blended Course
In addition to the online course . Physical demonstration is mandatory for this course , so i should go for Blended Course.
Lets go for 3 week of online course and 1 week of face to face training ( Blended Course ) .
Total Course : 21 days
Online Course : 2 Week
( 5 days per week for 1 hour )
( Saturday - Wednesday )
Face to Face : 1 Week
( 5 days daily 3 hours and
1 day final assessment for 5 hour )
-
If you have any query, please write.
-
-
-
If you have any query, please write.
-
-
Personal Protective Equipment, commonly referred to as "PPE", is equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses. These injuries and illnesses may result from contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. Personal Protective Equipment may include items such as below:
- Helmet
- Safety goggles
- Mask
- Apron
- Hand gloves
- Safety shoe
-
If you have any query, please write.
-
Electrical tools are tools used to work on an electrical system. These can include a wide range of tools such as below:
- Multimeter/AVO meter
- Earth tester
- Megger
- Pliers set
- Screwdrivers set
- Adjustable wrenches
- Wire splicers
- Knives
- Neon tester
- Hammer
- Mallet
-
If you have any query, please write.
-
Electrical Material is basically the parts or elements used in the making of any electrical construction project. These can include a wide range of materials such as below:
- Wire
- Socket
- Switch
- PVC tap
- Cable
- Solar home system
-
If you have any query, please write.
-
- Personal Protective Equipment (PPE) is collected and worn as per job requirement.
- Workplace is prepared as per job requirement.
- Tools and materials are selected & collected as per job requirement.
-
- Connection point is selected for CC camera connection as per drawing.
- Cable is laid as per diagram.
- Cable is connected with the CC TV camera as standard operation requirement.
- DVR is connected with CC camera.
- DVR is connected with computer.
- Performance is checked.
-
If you have any query, please write.
-
- Installation area is marked on the wall surface according to the drawing and layout.
- Insulation of wire is removed by 2 to 3 inches.
- Cable lug is punched with cable terminal
- Cable is laid according to the drawing
- Generator is connected with the changeover switch.
- All connections are checked according to the drawing.
- Performance of the generator is checked through switch OFF / ON.
-
If you have any query, please write.
-
- Solar panel installation area is marked according to the drawing and layout.
- Panel is installed following 45-degree angle in south face.
- One end of power cable is connected with solar home system and another end is connected with charge controller.
- Charge controller and battery are connected as per drawing.
- Battery and inverted are connected as per drawing.
- Load and inverter are connected as per drawing.
- All connections are checked according to the drawing.
- Performance of the solar home system is checked.
-
If you have any query, please write.
-
- The cable is laid as per diagram.
- The cable is connected with the IPS system.
- Performance of the install instant power supply (IPS). is checked through switch OFF / ON.
-
If you have any query, please write.
-
- Work area is cleaned in accordance with workplace procedures.
- Unused materials are stored for re-use or disposed following workplace procedures.
- Waste and scrap materials are disposed with following workplace procedures.
- Inventory of tools equipment are conducted and recorded as per checklist.
- Tools and equipment are cleaned and stored as per manufacturer's recommendation in appropriate location.
-
If you have any query, please write.
-