Topic outline

  • introduction

    UNIT TITLE: APPLY FUNDAMENTAL SKILLS FOR ELECTRICAL WORKS

    UNIT CODE: CONEIM1002A2

    UNIT DESCRIPTOR: This unit covers the knowledge, skills and attitudes required to apply fundamental skills for electrical works. It includes identifying materials and fitting used in electrical works, interpreting electrical sign, symbols and specifications from drawing plan, measuring current, measuring voltage and maintaining workplace, tools, equipment and materials.

    NOMINAL HOURS: 30 Hours

    LEARNING OUTCOME: At the end of this session, learners will be able to-

    FACILITATOR NAME: Md. Jahangir Alam Tarafder ( Shamol )

    TEACHER NAME: Md. Ayub-Ul-Azad

                                        Instructor

                                       Rajshahi technical training center, Rajshahi.

  • structure of the course

    The Structure of the course :

                                                        Only Online Course
                                                                     Or
                                                           Blended Course
    In addition to the online course . Physical demonstration is mandatory for this course , so i should go for Blended Course.
    Lets go for 3 week of online course and 1 week of face to face training ( Blended Course ) .

    Total Course :   21 days

    Online Course :  2 Week 

                               ( 5 days per week for 1 hour ) 

                                   ( Saturday - Wednesday )

    Face to Face : 1 Week 

                             ( 5 days daily 3 hours and 

                                         1 day final assessment for 5 hour )

  • mind map

  • p.p.e.-personal protective equipment

    Personal Protective Equipment, commonly referred to as "PPE", is equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses. These injuries and illnesses may result from contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. Personal Protective Equipment may include items such as below:

    • Helmet
    • Safety goggles
    • Mask
    • Apron
    • Hand gloves
    • Safety shoe
  • materials

    Electrical Material is basically the parts or elements used in the making of any electrical construction project. These can include a wide range of materials such as below:

    • Cable
    • Bracket
    • GI Wire
    • Elbow
    • Bend
    • PVC circular box
    • Rowel plug
    • Saddle
    • Screw
    • Tube light
    • Cable lugs
    • Cable tie
    • Insulating clip
    • Flexible conduit
    • Electric soldering lead
    • Copper plate
    • Copper sheet
    • Bare copper conductor
    • Plastic tape
  • fittings

    Electrical fittings means electric lines, fittings, apparatus and appliances de- signed for use by consumers of electricity for lighting, heating, motive power and other purposes for which electricity can be used. These can include a wide range of fittings such as below:

    • Switch
    • Switch box
    • Fuse
    • Regulator
    • Socket
    • Holder
    • Ceiling rose
    • Junction box
    • Channel
    • PVC pipe
    • PVC elbow
    • PVC band
    • Join socket
    • Circular box
  • drawings

    An electrical drawing is a type of technical drawing that shows information about power, lighting, and communication for an engineering or architectural project.

    • Technical drawings
    • Sketch
  • specifications

    Electrical Specifications means the specifications and requirements for electrical service to the Site.

    • Product specifications
    • Material types
    • Standards of work
    • Tolerances
    • Treatments and finishes
  • sign and symbols

    Electrical signs and symbols provide workers and others with information on electrical hazards and instructions on preventing harm. Labels, such as those used in PAT testing, inform people that electrical equipment and appliances are safe to use or not.

    • Fuse
    • Lamp
    • Earth
    • Indicator
    • Fan
    • Tube light
    • Calling bell
    • One-way switch
    • Two-way switch
    • Switch board
    • Two-pin-socket
    • Three-pin-socket
    • Regulator
    • Indicator lamp
    • SDB
    • MDB
    • Phase wire
    • Neutral wire
    • Earth wire
    • MCB / MCCB
    • Main switch
    • Capacitor
    • Coil / Blast
    • Starter
  • prepare for works

    1. Personal Protective Equipment (PPE) is collected and worn as per job requirement.
    2. Workplace is prepared as per job requirement.
    3. Tools and materials with drawings and symbols are selected and collected as per job requirement.
  • Elements of Competency: Identify materials and fittings used in electrical works

    1. Materials and fittings are collected and kept on table separately.
    2. Materials and fittings are identified and tagged with the name.
    3. Function and properties of materials and fittings are described.
  • Elements of Competency: Interpret electrical sign, symbols and specifications from drawing plan

    1. Relevant drawings are correctly identified as per requirement.
    2. All specifications are interpreted from the relevant drawing.
    3. All terms and abbreviations are interpreted from the relevant drawing.
    4. Sign and symbols are identified as per drawing.
  • Elements of Competency: Measure current

    1. Insulation of cable terminal is removed using knife or wire stripper as required.
    2. Range of ammeter is set as per job requirement.
    3. The ampere meter is connected in series with load as per circuit diagram.
    4. Power supply switch is kept on as maintaining Occupational Safety and Health (OSH).
    5. Deflection of the ampere meter pointer is observed and taken reading as required.
    6. Selector knob is adjusted of clip-on meter as required.
    7. Phase cable is inserted into the ring of the clip-on meter.
    8. Deflection of the clip-on meter pointer is observed and recorded as per workplace standard.
    9. Clip-on meter is disconnected from the phase line as required.
  • Elements of Competency: Measure voltage

    1. Insulation of cable terminal is removed using knife or wire stripper as required.
    2. Range of voltmeter is set as per job requirement
    3. Voltmeter is connected in parallel with the load as per circuit diagram.
    4. Power supply is switched ON as required.
    5. Deflection of the voltmeter pointer is observed and recorded as per workplace standard.
    6. AVO-meter pointer / scale is adjusted in zero position as required.
    7. Selector switch of AVO-meter is kept in AC voltage range as required.
    8. AVO-meter is connected to proof / test cord with supply line (phase to phase or phase to neutral) as per circuit diagram.
    9. Deflection of the AVO meter pointer is observed and recorded as per workplace standard.
    10. Power supply is disconnected as required.
  • Elements of Competency: Maintain workplace, tools, equipment and materials

    1. Work area is cleaned in accordance with workplace procedures.
    2. Unused materials are stored for re-use or disposed following workplace procedures.
    3. Waste and scrap materials are disposed with following workplace procedures.
    4. Inventory of tools equipment are conducted and recorded as per checklist.
    5. Tools and equipment are cleaned and stored as per manufacturer's recommendation in appropriate location.
  • course evaluation