Topic outline
-
UNIT TITLE: PERFORM INSTALLATION OF ELECTRICAL CIRCUIT
UNIT CODE: CONElM1005A2
UNIT DESCRIPTOR: This unit covers the knowledge, skills and attitudes required to perform installation of electrical circuit. It includes preparing for works, performing one lamp control by one-way switch, one lamp control by two-way switch, one calling bell control from two point, operation of fluorescent lamp circuit (tube light), connection of single-phase energy meter and maintaining workplace, tools and materials.
NOMINAL HOURS: 20 Hours
LEARNING OUTCOME: At the end of this session, learners will be able to-
- Prepare for works.
- Perform one lamp control by one way switch.
- Perform one lamp control by two way switch.
- Perform one calling bell control from two point.
- Perform operation of fluorescent lamp circuit (tube light).
- Perform connection of single-phase energy meter.
- Maintain workplace, tools, equipment and materials.
FACILITATOR NAME: Md. Jahangir Alam Tarafder ( Shamol )
TEACHER NAME: A.G.M Golam Kibria
Junior Instructor
Dinajpur Technical School & College, Dinajpur.
-
If you have any query, please write.
-
The Structure of the course :
Only Online Course
Or
Blended Course
In addition to the online course . Physical demonstration is mandatory for this course , so i should go for Blended Course.
Lets go for 3 week of online course and 1 week of face to face training ( Blended Course ) .
Total Course : 21 days
Online Course : 2 Week
( 5 days per week for 1 hour )
( Saturday - Wednesday )
Face to Face : 1 Week
( 5 days daily 3 hours and
1 day final assessment for 5 hour )
-
If you have any query, please write.
-
-
-
If you have any query, please write.
-
-
Personal Protective Equipment, commonly referred to as "PPE", is equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses. These injuries and illnesses may result from contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. Personal Protective Equipment may include items such as below:
- Helmet
- Safety goggles
- Mask
- Apron
- Hand gloves
- Safety shoe
-
If you have any query, please write.
-
Electrical tools are tools used to work on an electrical system. These can include a wide range of tools such as below:
- Hammer
- Cutting pliers
- Combination pliers
- Wire striper
- Neon tester
- Screw driver (flat, star and connecting)
- Electrician knife
- Watt meter
- Energy meter
- Multi meter
-
If you have any query, please write.
-
Electrical Material is basically the parts or elements used in the making of any electrical construction project. These can include a wide range of materials such as below:
- PVC Cable single occupation specific
- PVC Cable twine occupation specific
- Cable Flexible
- Bracket
- Gl wire
- Elbow
- Bend
- Boards
- PVC circular box
- Rowel plug
- Saddle
- Screw
- Tube light
- Cable lugs
- Cable tie
- Insulating clip
- Flexible conduit
- Electric soldering lead
- Copper plate
- Copper sheet
- Bare copper conductor
- Plastic tape
-
If you have any query, please write.
-
Electrical fittings means electric lines, fittings, apparatus and appliances de- signed for use by consumers of electricity for lighting, heating, motive power and other purposes for which electricity can be used. These can include a wide range of fittings such as below:
- Switches
- Sockets
- Fuses
- MCB
- Fan regulator
- Bracket
- Soccer
- Ballast (chock coil)
- Starter
- Tube light holder
- Batten holder
- Ceiling rose
-
If you have any query, please write.
-
1. Personal Protective Equipment (PPE) is collected and worn as per job requirement.
2. Workplace is prepared as per job requirement.
3. Tools, and materials are selected and collected as per job requirement. -
1. Circuit layout is drawn as per drawing.
2. Circuit materials are placed on the board as per drawing.
3. Fittings are connected and fitted in to circuit as per drawing.
4. Circuit connection is checked according to the drawing.
5. Circuit is tested while connected power supply by following OSH.-
If you have any query, please write.
-
-
1. Circuit layout is drawn as per drawing.
2. Circuit materials are placed on the board as per drawing.
3. Fittings are connected and fitted in to circuit as per drawing.
4. Circuit connection is checked according to the drawing.
5. Circuit is tested while connected power supply by following OSH.-
If you have any query, please write.
-
-
1. Circuit layout is drawn as per drawing.
2. Circuit materials are placed on the board as per drawing.
3. Fittings are connected and fitted in to circuit as per drawing.
4. Circuit connection is checked according to the drawing.
5. Circuit is tested while connected power supply by following OSH.-
If you have any query, please write.
-
-
1. Circuit layout is drawn as per drawing.
2. Circuit materials are placed on the board as per drawing.
3. Fittings are connected and fitted in to circuit as per drawing.
4. Circuit connection is checked according to the drawing.
5. Circuit is tested while connected power supply by following OSH.-
If you have any query, please write.
-
-
1. Circuit layout is drawn as per drawing.
2. Circuit materials are placed on the board as per drawing.
3. Fittings are connected and fitted in to circuit as per drawing.
4. Circuit connection is checked according to the drawing.
5. Circuit is tested while connected power supply by following OSH.-
If you have any query, please write.
-
-
1. Work area is cleaned in accordance with workplace procedures.
2. Unused materials are stored for re-use or disposed following workplace procedures.
3. Waste and scrap materials are disposed with following workplace procedures.
4. Inventory of tools equipment are conducted and recorded as per checklist.
5. Tools and equipment are cleaned and stored as per manufacturer's recommendation in appropriate location.-
If you have any query, please write.
-