Topic outline
-
UNIT TITLE: PERFORM INSTALLATION OF ELECTRICAL FITTINGS
UNIT CODE: CONElM1006A2
UNIT DESCRIPTOR: This unit covers the knowledge, skills and attitudes required to perform installation of electrical fittings. It includes preparing for works, fixing-up cut-outs / fuses / indicator with switch board, performing fixing of batten holder, performing fixing of batten holder, fixing of ceiling rose and maintaining workplace, tools, equipment and materials.
NOMINAL HOURS: 30 Hours
LEARNING OUTCOME: At the end of this session, learners will be able to-
- Prepare for works.
- Fix-up Cut-outs/ Fuses/ Indicator with switch board.
- Perform fixing of batten holder.
- Perform fixing of ceiling rose.
- Maintain workplace, tools, equipment and materials.
FACILITATOR NAME: Md. Jahangir Alam Tarafder ( Shamol )
TEACHER NAME: A.G.M Golam Kibria
Junior Instructor
Dinajpur Technical School & College, Dinajpur.
-
If you have any query, please write.
-
The Structure of the course :
Only Online Course
Or
Blended Course
In addition to the online course . Physical demonstration is mandatory for this course , so i should go for Blended Course.
Lets go for 3 week of online course and 1 week of face to face training ( Blended Course ) .
Total Course : 21 days
Online Course : 2 Week
( 5 days per week for 1 hour )
( Saturday - Wednesday )
Face to Face : 1 Week
( 5 days daily 3 hours and
1 day final assessment for 5 hour )
-
If you have any query, please write.
-
-
-
If you have any query, please write.
-
-
Personal Protective Equipment, commonly referred to as "PPE", is equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses. These injuries and illnesses may result from contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. Personal Protective Equipment may include items such as below:
- Helmet
- Safety goggles
- Mask
- Apron
- Hand gloves
- Safety shoe
-
If you have any query, please write.
-
Electrical tools are tools used to work on an electrical system. These can include a wide range of tools such as below:
- Hammer
- Cutting pliers
- Combination pliers
- Wire striper
- Neon tester
- Screw driver (flat, star and connecting)
- Electrician knife
-
If you have any query, please write.
-
The set of articles or physical resources serving to equip a person or thing. These can include a wide range of equipment such as below:
- Ladder
- Working bench
-
If you have any query, please write.
-
Required circuit materials are as below:
- Cable
- Bracket
- Rowel plug
- Screw
- Insulation tape
- Fuses
- Ceiling rose
- Holder
- Cut-out
- Indicator
-
If you have any query, please write.
-
1. Personal Protective Equipment (PPE) is collected and worn as per job requirement.
2. Workplace is prepared as per job requirement.
3. Tools, and materials are selected and collected as per job requirement. -
1. Base part of fuse and cut out is fixed with the switch board / SDB using screw.
2. Cable terminal insulation is removed by using wire striper.
3. One part of the cable is connected with the terminal of base of the fuse / cut out and other part of the cable is connected with the power supply as per circuit diagram.
4. Other part of the cable is connected with the power supply as per circuit diagram.
5. Fusing wire is connected with the fusing bridge as per circuit diagram.
6. Fusing bridge / cut out is fitted with base.
7. Indicator is fixed on the switch board as per diagram
8. Operation is checked of the fuse and cut out with load.-
If you have any query, please write.
-
-
1. Holder setting point is marked on board.
2. Cable is connected with bottom parts.
3. Bottom part of holder is fitted on the board.
4. Upper part is fitted on the bottom part.-
If you have any query, please write.
-
-
1. Ceiling rose point is marked on board.
2. Cable is connected with bottom parts.
3. Bottom part of ceiling rose is fitted on the board.
4. Upper part is fitted on the bottom part.-
If you have any query, please write.
-
-
1. Work area is cleaned in accordance with workplace procedures.
2. Unused materials are stored for re-use or disposed following workplace procedures.
3. Waste and scrap materials are disposed with following workplace procedures.
4. Inventory of tools equipment are conducted and recorded as per checklist.
5. Tools and equipment are cleaned and stored as per manufacturer's recommendation in appropriate location.-
If you have any query, please write.
-
-