UNIT TITLE: PERFORM CONCEALED WORK
UNIT CODE: CONElM2010A2
UNIT DESCRIPTOR: This unit covers the knowledge, skills and attitudes required to perform concealed work. It includes preparing for works, performing switch box installation, installing junction box, performing pipe fitting in the roof, performing grove cutting and maintaining workplace, tools, equipment and materials.
NOMINAL HOURS: 50 Hours
LEARNING OUTCOME: At the end of this session, learners will be able to-
- Prepare for works.
- Perform switch box installation.
- Install junction box.
- Perform pipe fitting in the roof.
- Perform grove cutting.
- Maintain workplace, tools, equipment and materials.
FACILITATOR NAME: Md. Jahangir Alam Tarafder ( Shamol )
TEACHER NAME: Md. Ayub-Ul-Azad
Instructor
Rajshahi Technical Training Center, Rajshahi.
-
If you have any query, please write.
-
The Structure of the course :
Only Online Course
Or
Blended Course
In addition to the online course . Physical demonstration is mandatory for this course , so i should go for Blended Course.
Lets go for 3 week of online course and 1 week of face to face training ( Blended Course ) .
Total Course : 21 days
Online Course : 2 Week
( 5 days per week for 1 hour )
( Saturday - Wednesday )
Face to Face : 1 Week
( 5 days daily 3 hours and
1 day final assessment for 5 hour )
-
If you have any query, please write.
-
-
-
If you have any query, please write.
-
-
Personal Protective Equipment, commonly referred to as "PPE", is equipment worn to minimize exposure to hazards that cause serious workplace injuries and illnesses. These injuries and illnesses may result from contact with chemical, radiological, physical, electrical, mechanical, or other workplace hazards. Personal Protective Equipment may include items such as below:
- Helmet
- Safety goggles
- Mask
- Apron
- Hand gloves
- Safety shoe
- Safety belt with harness
-
if you have any query, please write.
-
Electrical tools are tools used to work on an electrical system. These can include a wide range of tools such as below:
- Hammer
- Combination pliers
- Screwdrivers
- Chisel
- Grinding machine
-
If you have any query, please write.
-
Electrical Material is basically the parts or elements used in the making of any electrical construction project. These can include a wide range of materials such as below:
- Gl Wire
- Grinding disc
- Pipe
- Circular box
- Elbow
- Joint socket
- Nail
- Bend
- Paper
-
If you have any query, please write.
-
1. Personal Protective Equipment (PPE) is collected and worn as per job requirement.
2. Workplace is prepared as per job requirement.
3. Tools, and materials are selected and collected as per job requirement. -
- Wall is marked as per layout diagram.
- Grove is cut using grinding machine and chisel hammer.
- Switch box is fitted into grove using nail.
-
If you have any query, please write.
-
- Wall is marked as per layout diagram.
- Grove is cut using grinding machine and chisel hammer.
- Junction box is fitted into grove using nail.
-
If you have any query, please write.
-
- Fitting points are marked as per drawing.
- Pipes are laid on the roof as per drawing.
- Pipes are connected with fittings.
- Pipes are tighten using Gl wire.
- Terminal points of pipe are covered using paper to protect from cement / sand.
-
If you have any query, please write.
-
- Wall is marked as per layout diagram.
- Grove is cut using grinding machine and chisel hammer.
-
If you have any query, please write.
-
- Work area is cleaned in accordance with workplace procedures.
- Unused materials are stored for re-use or disposed following workplace procedures.
- Waste and scrap materials are disposed with following workplace procedures.
- Inventory of tools equipment are conducted and recorded as per checklist.
- Tools and equipment are cleaned and stored as per manufacturer's recommendation in appropriate location.
-
If you have any query, please write.
-